In today’s ever-evolving society, a lot of buildings have sprouted up in a short period of time. For the construction of such works, it is necessary to have a supervisor and create processes, and so-called construction supervision procedures, and this process plays an extremely important role. in order to be able to ensure that the works are comprehensively monitored.

Inspection order of construction supervision process

  • Check design documents: The chief supervisor must check the correctness of the design documents, approved technical instructions and compare them with the scene, propose to the customer representative the plan to solve the problems. in design for practical fit.
  • Making a plan for implementation: Based on the design documents, approved technical instructions in the bidding documents, current processes, regulations and standards, the chief supervisor prepares a plan to carry out the supervision work. quality control during construction.
  • Checking construction design documents: The chief supervisor must check the design documents of the construction organization plan for each work item according to the bidding documents and sign and approve the construction drawing documents and construction organization and submit them to the Owner. approved investment.
     
  • Inspection and supervision of the construction process of works items:
     
    Basic data The field supervisor checks the basic data such as topographic survey data, hydrogeology compared with the field, if any difference is found, it must be reported to the chief supervisor, the chief supervisor. report to the Customer Representative for remedial action

Inspection order of construction supervision process

  • Materials: origin, test certificates, applicable standards;
     
  • Equipment: quantity, type. Each type of equipment must have origin, technical certificate, capacity to complete the work, (According to design standards and bidding documents);
     
  • Labor, the number of specialized workers to perform the work. Each employee must check his/her background on qualifications, skills and ability to meet the job (according to the bidding documents);
     
  • Experiment: Must fully demonstrate the features and properties of the item to be tested. The field supervisor must perform the following specific tasks:

Supervision consulting process

  • Step 1: Check the correctness of the profile in the design. This is the first step and is also considered the most important step in consulting as well as supervision, a consulting engineer has the responsibility as well as the obligation to survey and inspect. then carefully evaluate the documents in the construction design part, verify the estimate and in parallel, the construction technical standards will be applied and compared in a more realistic way with the current situation. during the construction process so that we can promptly detect shortcomings and propose effective solutions for the project and ensure better as well as reduce the costs incurred. without being worth it.
  • Step 2: Develop a plan to deploy and supervise the construction. The Chief Engineer assigned to the project will supervise and, based on that, the entire design file, and as amended, if there is a combination with technical regulations. The technique is applied together with the construction standards of Vietnam, the most modern at present, from which to draw up plans on the performance of construction supervision functions in construction works.
  • Step 3: Evaluate the construction design documents. This is the job as well as the inspection of all documents belonging to the construction design part of each item in the project to be able to ensure that everything is done very strictly according to a set standard. provided, and on construction standards and specifications.
  • Step 4: Monitor each item in construction. The engineer in the supervision section is always responsible for covering as well as closely monitoring each construction item, checking each data that has been statistically related to issues related to the project. related to geology as well as construction to compare with the actual field, from which to promptly detect errors and then provide effective and fast handling solutions.
  • Step 5: Thorough inspection along with strict acceptance tests for each type of construction material and all types of machinery and labor used in a project.